Main Accumulator Control Panel, O/No. A96800, c.1979

Order A96800 for Mannesmann Demag GmbH, West Germany, c.1979

R013
By kind permission of Rhodes Interform Ltd.
R014
By kind permission of Rhodes Interform Ltd.

This equipment was procured for a large steel mill in USSR, Mannesmann Demag being the main contractor.  A separate company, Fielding Plant Design Ltd., Bournemouth (by this time no connection with F & P, Gloucester), was involved in the design of certain aspects of the steel mill and recommended F&P as supplier of the Main and Descaler accumulator control systems. Their electrical engineer, John Tranter, a former employee of F&P, had earlier moved to Bournemouth and was instrumental in this recommendation!

Click on a photograph to enlarge an image.

Click on the hyperlink to see other Notable Orders from the 1970s

If you remember designing, machining, fitting, installing, maintaining, or working with this machine please share your memories at the bottom of the page by clicking on the words Add a comment about this page.

No Comments

Start the ball rolling by posting a comment on this page!

Add a comment about this page

Your email address will not be published.