At Full Stretch

A film telling the story of the design, manufacture, and installation of the 3900 ton Stretcher that helped build Concorde

Click on the image to play the video. Then click on the square icon at the bottom-right corner of the film to watch it in full-screen mode. Press Esc. to exit full-screen mode.

A Stretcher of 3900 tons power was needed by CEGEDUR (France’s leading aluminium firm) to help build parts for the supersonic jet Concorde. The Stretcher was needed to stress relieve large aluminium slabs used in the production of stressed members required by large aircraft of the future.  Fielding’s were awarded the contract to design and build this Stretcher, in only 14 months, for CEGEDUR’s Issoire factory in southern France.  The film shows the building and testing of this giant stretcher and also some parts of the production of aluminium slabs.

If this film brings back memories of Fielding and Platt – the people, places, and machinery that appear in it – or if you learnt anything from or enjoyed this film, please share your memories and thoughts by clicking on the words Add a comment about this page.

No Comments

Start the ball rolling by posting a comment on this page!

Add a comment about this page

Your email address will not be published.